2007 (currant) Lean Project Manager, ASSA ABLOY, Romania (£18m)
Responsible for devising and managing the implementation of a £500K lean cost reduction program.

2005/6 (2 years) Romania Relocation Director, Hi-Lo Storage Systems Ltd., (£30m)
Responsible for relocation of manufacturing to Romania. This involved research and site selection, planning flow line production, supervision and operator selection and training, refurbishment of a 10,000 sq m factory and starting up production. The total investment was £8m and included introducing new processes, purchasing and transferring equipment and developing supply chain relationships.




2004 (1 year) Operations Director, Hi-Lo Storage Systems Ltd.,
Responsible for establishing a viable business as a basis for expansion into a broader based warehouse systems provider. This was successful and the business then grew through acquisition from £8m to £25m.

2003 (4 months) Interim Divisional Operations Director, Welconstruct Group
Reorganisation of manufacturing to establish profitability and prepare the London operations for sale.

2002/3 (9 months) Business Relocation Consultant, Nutrimetics North America, a Sara Lee cosmetics direct selling business(£2m).
Responsible for outsourcing fulfillment in Canada and the US and integrating the two businesses. Brian also advised the group on the introduction of Lean Thinking.

2001/2 (7 months) Interim Operations Director, Avroy Slain, South Africa a Sara Lee cosmetics business (£10m).
Responsible for evaluating all manufacturing outsourcing options, setting up contracts and planning the transition.

1989-2000 Interim Operations/Project Management and Consultancy Assignments

Operations/Project Management

2000 Oxford Plastics (£4m), Operations improvement and restructuring. Plastic moulding. This included the recruitment of operators to suit new shift patterns and restructuring the management team.

2000 AVF Group (£20m), Improved production management (Lean) and supply chain control. Light metal structures. Output was more than doubled and plans prepared for further lean improvements.

1998 Courtaulds Packaging (£20m), Improved performance preparatory to sale of the business. Toothpast tubes.

1997/8 Abru Aluminium (£25m), Manufacturing relocation from Cornwall to Derbyshire. Ladders.

1997 Cleanaway London Division (£30m), Profitability turn-around of Essex waste disposal sites.

1996/7 Interlux, Barlow Group (£25m), Operations improvement prior to sale. Aluminium lighting systems. Units per hour were more than doubled.

1995 Cleanaway London Division (£30m), Profitability turn-around. Waste processing.

1992 Scottish Power Transmission Systems (£120m), Rationalisation of maintenance operations and organization reducing costs by over 30%.

1991 Kone Curruthers Cranes (£10m), Operations performance improvement increasing output by over 40%.

1990 General Manager of small business start-up.

1989 Solar Designs (volume jewelry £10m), Operations systems and management improvement.


Consultancy

2002 Rollalong (modular building project £11m), Materials management consultant.

2000 Lamont Group, (textile printing £15m), Operations improvement and business integration.

1999 Belle Engineering (£20m), Operations cost reduction and strategic planning for cement processing equipment.

1997 Rugby Plastics (£30m), Customer Services improvement for window systems operations.

1996 Scottish Power (metering division £10m), Advising on the integration/closure of acquired businesses.

1993/4 Portman Hart, Quality Systems Consultancy, Assisting businesses and service organization achieve ISO 9000 accreditation.

Operations Management, Permanent Positions

1987/8 Operations Manager Grifflex Creators (ACI/BTR) (£10m plastics extrusion)

Responsible for the turn-around in profitability of its manufacturing and distribution operations.

1983/87 Manufacturing Manager Pains Wessex (Chemring) (£15m pyrotechnics and explosives)

Responsible for achieving improving profitability and expansion within the 75 acre site.



1977/83 Production Manager Bristol Composite Materials (BP) (£10m aircraft structures and armour products)

Responsible for managing the manufacturing through a transition to profitability which involved the introduction of MRP systems, capital investment and restructuring the workforce.

1968/77 Manufacturing Technology Project Manager Rolls Royce aircraft engines.

Latterly responsible for co-ordination of the introduction of new technology across Europe.


Education

Brian completed an Engineering/Undergraduate Apprenticeship with Rolls Royce, he then qualified with a BSc honours degree in Production Engineering from Aston University, Birmingham and also an MSc in Welding Technology and Management also from Aston. He is a Member of the Institution of Electrical Engineers and a Chartered Engineer.

He has kept up to date by engaging in vocational training and over recent years has attended courses in Kaizen Implementation, Project Management and Environmental Control. Previous courses included Process Modelling, Manufacturing Logistics, Strategic Planning and Business Re-Engineering, Change Management and other subjects such as ISO9000 and TQM.


Skills

Operations change management skills where major performance improvement is needed or guidance through a period of change and development, with extensive lean process experience.

First class interpersonal/change management ability, operations performance improvement (Lean Thinking), supply and distribution chain development and relocation project management.


Languages

English

 Select

Candidate search for

interimmanagementPaste your project description here