Work Experience

EXPERIENCE
04/2009 – 05/2010: Engineering Manager, Al Rajhi Alliance, Saudi Arabia
Makkah to Madina High Speed Railway
Year: 2009
Location: Jeddah, Saudi Arabia
Client: Saudi Railways Organisation
Position held: Engineering Manager
Main project features: Design and Build project comprising civil engineering works for 450 km of high speed railway.
Activities performed: Responsible for planning and managing the design and construction for civil engineering works and rail earthworks and bridge packages, including value engineering and quality control. Also responsible for implementing systems for evaluation of suppliers, materials and sub-contractors. Total scheme cost USD 10 billion.

03/2008- 04/2009: Deputy Director, Sama Dubai / EC Harris JV, Dubai
The Lagoons, Dubai, UAE
Year: 2008-2009
Location: Dubai, UAE
Client: Sama Dubai
Positions Held: Deputy Director / Senior Project Manager
Main project features: The Lagoons development consists of seven artificial islands, each linked by causeways and comprising residential apartments, shopping malls, office buildings, five-star hotels, resorts, a museum, marinas, and Dubai\'s first opera house. Site covers 70 million square feet.
Activities performed: Managed design, construction and logistics of infrastructure assets on The Lagoons project, including quay walls, canals, substations, district cooling, roads, bridges, tunnels, transportation links (light rail) and building interfaces. Defined objectives, reviewed detailed work plans, schedules, budgets, procedures, best practices and lessons learned. Managed preparation of Project Execution Plan, Contract Management Plan, Site Logistics Plan and carried out constructability reviews. Oversight of environmental monitoring programme, document control and records management. Scheme cost USD 18 billion.

09/2007 – 03/2008: Senior Project Manager, Mace, Bahrain
Riffa Views Development
Year: 2008
Location: Bahrain
Client: Arcapita Bank
Position Held: Senior Project Manager
Main project features: Riffa Views is a luxury development covering 28 million square feet, with over 900 villas, international golf course, including an international school, restaurants, cafes, Mosque, Country Club, and many other sports, entertainment and social facilities.
Activities performed: Managed site enabling works, roads, sewerage, drainage, wastewater treatment plant, reverse osmosis plant and electricity sub-stations for Riffa Views residential development. Significant oil and gas diversions, well management, pipeline relocations and installation of manifolds. Scheme cost USD 66 million.
Bahrain Bay Development
Year: 2008
Location: Bahrain
Client: Arcapita Bank
Position held: Senior Project Manager
Main project features: A landmark waterfront community consisting of an island connected to the mainland by two road bridges, the development will include business, retail and residential areas.
Activities performed: Managed seafront land reclamation, quay wall construction and infrastructure works such as water, road, sewage, sub-stations, district cooling plant, storm drainage, irrigation networks, and telecommunication systems. Scheme cost USD 2.5 billion.

02/2007-09/2007: SENIOR PROJECT MANAGER, PARSONS, DUBAI
Led teams to deliver highway and infrastructure designs for new developments to a variety of clients. Responsibilities included managing preliminary and detailed design, preparation of scheme reports, financial management of projects, developing new work areas and maintaining exceptional client relations.
Sama Al Jaddaf Development
Year 2007
Location: Dubai, UAE
Client: Sama Dubai/Tatweer
Position held: Senior Project Manager
Main project features: Development consists of a completely new residential area with commercial and hospitality developments and intelligent design incorporated within the project.
Activities performed: Managed preliminary and detailed designs of internal road network and service corridors for a mixed use development in Dubai. Managed client interface and liaison with sub-consultants. Scheme cost AED 650 million.
Dubai Metro
Year: 2007-2008
Location: Dubai, UAE
Client: Road & Transport Authority (RTA)
Position held: Senior Project Manager
Main project features: A completely new urban light rail system comprising 166 km of track, 57 stations including at grade, elevated and underground stations.
Activities performed: Carried out independent design checks of road and rail bridge designs and highway interfaces prepared by design consultant. Also carried out due diligence checks and liaised with municipality and stakeholders. Scheme cost USD 4.2 billion.
Dubai International Financial Centre
Year: 2007
Location: Dubai, UAE
Client: DIFC
Position held: Senior Project Manager
Main project features: The DIFC District in addition to a financial hub will host a unique, world-class integration of buildings, including offices, serviced apartments, hotels, shops and restaurants.
Activities performed: Advised client on all infrastructure matters related to parcels, buildings and highway interfaces. Also liaised with architects, consultants and contractors to achieve objectives. Scheme cost AED 25 billion.
RemRaam Development
Year: 2007-2008
Location: Dubai, UAE
Client: Tatweer
Position held: Senior Project Manager
Main project features: A residential development comprising 11,000 residential units (low rise Arabian style buildings) including parks, sports facilities and open spaces for recreation.
Activities performed: Managed the infrastructure design for a completely new housing development. Prepared grading plans, highways and sewerage design and layout. Extensive interface with stakeholders and Client. Scheme cost AED 3.5 billion.

01/2005 – 02/2007: ASSOCIATE DIRECTOR, AECOM|FABER MAUNSELL, UK
Managed teams to deliver high quality transportation and infrastructure projects. Developed and prepared proposals, project finances, and work areas. Also made project decisions regarding technical approaches, costs, scheduling and the development and implementation of recommendations for corrective action. Mentored and coached junior project managers to deliver projects within scope, timescale, budget constraints and quality expectations.

Stansted Airport Generation 2 Development
Year: 2006
Location: UK
Client: BAA
Position held: Associate Director
Main project features: Construction of a second runway at Stansted Airport and design of associated public transport, highway and environmental improvements.
Activities performed: Led design team in the preparation of Scheme and Project Appraisal reports concerning access strategies and master plan documents. Also provided construction advice and oversaw compliance with ISO 14001 requirements. Scheme cost £1.5 billion.
North Harlow Development
Year: 2006
Location: UK
Client: North Harlow Development
Position held: Associate Director
Main project features: Mixed use development project for 15,000 new homes.
Activities performed: Managed infrastructure design and liaised with developer and local authorities to establish designs related to internal road network and associated infrastructure. Scheme costs £350 million.
East London Transit Phase 1A
Year: 2006
Location: UK
Client: Transport for London
Position held: Associate Director
Main project features: Improvements to bus transit corridor including bus priority measures.
Activities performed: Carried out technical audits and due diligence checks of all detailed design and contract documents in preparation for tendering £15 scheme.
Braþov Bypass
Year: 2006
Location: Romania
Client: Romanian National Company of Motorways and National Roads
Position held: Associate Director
Main project features: Construction of approximately 31 Km of new single carriageway road bypassing the city of Braþov.
Activities performed: Prepared tender documents and managed preliminary design for Braþov bypass scheme funded by World Bank. Scheme cost €40 million.
M1 Junction 14 Improvement
Year: 2007
Location: UK
Client: Department for Transport/Milton Keynes Council
Position held: Associate Director
Main project features: Widening of the M1 slip roads at Junction 14, widening of the A509 to three lanes, a new access from the A509 Portway for a future lorry park and provision of a link under the A509 to the park and ride facility near Milton Keynes.
Activities performed: Prepared submission of tender designs for design and build scheme at J14 of the M1 and improvements to Park & Ride and public transport facilities in Milton Keynes. Scheme cost £20 Million.
M7/M8 Motorway PPP Scheme
Year: 2007
Location: Ireland
Client: National Roads Authority
Position held: Associate Director
Main project features: Motorway extension and toll gate south of Portlaoise on the M7 at junction with M8. Comprises 143 km of motorway and 18 junctions.
Activities performed: Managed tender designs and documents for the M7/M8 motorway toll scheme from Portlaoise to Cullahill. Scheme cost €300 million.

2000 – 2005: PROJECT LEADER, HIGHWAYS AGENCY, MAJOR PROJECTS DIVISION
Delivered privately financed and conventional design and build of trunk roads and motorway improvement schemes costing over £100 million. Contract and preparation of tender documentation, including NEC, ECC and ICE 5th & 6th. Also maintained smooth and accurate communication channels, prepared robust projects plans, progress reporting and issue resolution. Directed construction of new highways, bridges, flyovers, tunnels and parallel widening of existing highways. Managed excavation, tunnelling, testing and installation of bridge piles and caissons. Managed construction of bridge piers, abutments, beams, deck slabs, waterproofing and paving. Managed earthworks - bulk excavation, soil stabilization and embankment formation and grading. Coordinated inspection and testing plans and operations with materials engineers. Designed and implemented traffic management and diversion schemes. Interfaced with bridge superintendents, construction managers, vendors, owners and inspectors. Assisted in determining labour, equipment and material needs. Managed installation of drainage pipe, culverts and utilities. Assisted Site Agent in managing and scheduling crews, subcontractors and materials. Maintained records including time sheets, safety, production, attendance reports. Coordinated invoicing and billing with quantity surveyors. Promoted and enforced site safety, health and environment regulations and procedures. Frequently acted as spokesman for the Agency and gave numerous radio interviews. Managed staff and liaised with Directors, Board of Directors, Ministers, Members of Parliament, Government departments, interest groups and the public.
M40/A404 Handy Cross Junction Improvement
Year: 2004-2005
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: Early Contractor Involvement (ECI) motorway junction improvement scheme between the M40 and the A404 at Handy Cross near High Wycombe.
Activities performed: Managed consultants, contractor, contractor’s designer to prepare the design, cost related matters, public consultation, liaison and site supervision. Managed construction of new connecting highway, additional lanes and a new five lane \"cross link\" between the M40 and the A404 south of the junction. Scheme cost £25 million.
A27 Chichester Bypass and Area Improvements
Year: 2003-2005
Location: UK
Client: Department for Transport/West Sussex County Council
Position held: Project Leader
Main project features: Improvements to motorway junctions on A27 at Chichester, including complementary measures, such as bus priority at junctions and new park and ride facilities.
Activities performed: Managed consultants in partnership with West Sussex County Council, to produce a series of junction improvements to increase capacity at bottlenecks on the A27. Managed public feasibility studies and prepared reports for Ministerial approval. Scheme cost £80 million.
A2/A282 Dartford Improvement
Year: 2001-2004
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: Motorway junction improvement scheme at Junction 2 on the M25 London orbital motorway. Also widening of the A2 from three lanes to four lanes for a distance of 2 kilometres.
Position held: Project Leader
Activities performed: Scheme of national and international importance valued at £120 million. Responsible for managing the team of consultants to prepare the design, Environmental Statement and Scheme Orders to correct standards. Successfully defended Scheme Orders and Environmental Statement as Government’s Chief Witness at Public Inquiry in 2003.
M20 Junction 10 Interim Scheme
Year: 2001-2005
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: Motorway junction improvement scheme at Junction 10 on the M20. Scheme to provide additional capacity by widening over-bridges and slip roads. £15 million scheme funded by developers under s.278 in Ashford.
Activities performed: Planned and managed the design and site supervision of the improvements in partnership with local authorities Ashford Borough Council and Kent County Council.
M20 Junction 10A
Year: 2002-2005
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: Early Contractor Involvement (ECI) scheme comprised a completely new grade separated motorway junction south of the existing junction on the M20 motorway.
Activities performed: Managed consultants to prepare designs sufficiently to take the scheme to public consultation. Scheme valued at £67 million in the Government\'s Targeted Programme of Improvements.
A3 Thursley Junction Improvement
Year: 2003-2004
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: A design and build scheme comprising a completely new grade separated junction over a trunk road of motorway standard.
Activities performed: Highways Agency\'s resident engineer on site with the contractor. Held frequent meetings to ensure work remained on schedule and key milestones met. Responsible for ensuring invoices checked and paid on time. Scheme cost £7m and completed 3 months ahead of schedule and within budget.
A249 Iwade to Queenborough
Year: 2001
Location: UK
Client: Department for Transport
Position held: Project Leader
Main project features: Design, Build Finance and Operate (DBFO) PPP scheme comprised 10 km of new dual carriageway trunk road and new bridge over Swale estuary.
Activities performed: Chaired steering group meetings with consultants, financial and legal teams and oversaw preparation of detailed design and the DBFO procurement process. Scheme cost £100m.

1998 – 2000: PRINCIPAL ENGINEER, TRANSPORTATION
LONDON BOROUGH OF HAMMERSMITH & FULHAM, UK
Managed transportation team and led on traffic signals, pedestrian crossings, accident investigation programme, area environmental improvement schemes, review of applications for planning permission and the traffic impacts of new developments. Ensured compliance with Quality Assurance procedures (ISO 9001). Progressed the effective project management of assigned projects from conception to implementation and monitoring. Served as Resident Engineer on major highway pavement and asset management schemes. Assigned tasks to team members; directed, instructed and examined performance of tasks. Reviewed all contract documents, drawings and technical specifications. Reviewed preparation of engineering drawings and contractor’s shop drawings. Supervised construction and monitored contract implementation for each package of works. Monitored construction of work packages and their environmental and social effects. Reviewed contractor’s technical requirements, in respect of personnel, equipment, construction method and inspection and approval of construction materials. Held weekly meetings with the contractor’s key personnel to ensure compliance with technical specifications, quality requirements and to address adjustments and issues.

1993 – 1998: SENIOR ENGINEER, HIGHWAYS AND TRANSPORTATION
WATFORD BOROUGH COUNCIL, UK
Led transportation team on traffic and strategic transportation issues in the borough. Designed traffic management measures, junction improvement schemes, modelling and installation of traffic signals, pedestrian crossing facilities, cycle routes, accident investigation and prevention and urban drainage schemes. Responsible for review of all planning applications for traffic impact assessments. Extensive negotiations with developers and their consultants. On-site management of construction contractors; preparation of contract and tender documentation, estimates, and schedule programming. Advised on development control issues, traffic impacts of new developments and s.106, s. 104 and s.278 agreements.
1992 – 1993: <full time study for MSc>
1988 – 1992: CONSTRUCTION ANALYST, DISASTER ASSISTANCE DIVISION
UNITED STATES GOVERNMENT, SBA, ATLANTA, GA, USA
Reviewed contracts and estimated reconstruction and repair costs for commercial, residential and heavy infrastructure projects (roads, highways and bridges). Reviewed designs and negotiated with contractors. Analysed proposed structures and devices for mitigation of future impacts. Monitored schedules, cost controls, contract compliance, financial audits and recommendations for funds disbursements. Frequently travelled to sites for monitoring and verification of construction progress. Awarded Certificate of Commendation for record number of projects completed in 1990.
1986 – 1988: ENGINEER, HIGHWAYS
GWINNETT COUNTY ENGINEERING DEPT, LAWRENCEVILLE, GA, USA
Responsibilities included design, implementation and supervision of projects in highways, traffic and transportation engineering. Tested signal optimization software (PASSER 2) prior to its nation-wide distribution. Duties included traffic intersection design, conducting feasibility studies, collection and evaluation of data, statistical analysis and recommendations for improvements. Preparation of quantities, proposal and specification writing for competitive tendering, review of projects and budgetary control were also part of my duties. Liaison with contractors and the public was also required.

1984 – 1986: ENGINEER, HIGHWAY DESIGN
E. W. FINLEY & PARTNERS, ATLANTA, GA, USA
As part of a design team responsibilities included preparing designs of highway geometry and earthwork analyses for multi-lane divided highway systems. Duties included reduction of survey data, design of grading, paving and drainage. Extensive use of computer software in design calculations. Responsible for preliminary plans and supervision of drafting. Also undertook traffic related studies for clients. Liaison with clients, government agencies, general public and participation in public hearings.

Education

MSc & DIC in Civil Engineering 2002
Imperial College, London
Diploma in Management 2000
The Industrial Society, London
MSc in Mgt. of Intellectual Property 1993
Queen Mary College, London
Bachelor of Civil Engineering 1984
Georgia Institute of Technology
Atlanta, Georgia, USA
Bachelor of Science (Maths & Physics) 1981
University of Georgia
Athens, Georgia, USA

Skills

Over 25 years’ international experience in the US, UK, Ireland and more recently as a freelance engineer in the UAE, Bahrain and Saudi Arabia. Extensive expertise in design, construction supervision and project management of major projects in highways, rail, bridges and infrastructure for mixed use developments.

Languages

English - fluent
French - good
Arabic - working knowledge

Other

Chartered Civil Engineer
Institution of Civil Engineers MICE
Chartered Engineer
Institution of Engineers of Ireland MIEI
Institution of Highways & Transportation MIHT
Member Association for Project Management MAPM